Pressure Relief & Permeability: Significantly Improved
Our system quickly eliminates outburst risks via destress gas drainage. This has doubled excavation speeds for you:
- Cross-strata borehole protected rock roadways: From 100m/month to 200m/month.
- Along-seam strip pre-drainage protected excavation: From ~60m/month to ~120m/month.